For an estimate, phone (801) 735-8491 or write to us through the estimate form: what you want built or repaired, which rooms, and whether you have plans drawn or a permit yet.
How Draper's homes went up in the 1990s and 2000s
Draper incorporated in 1978, and the Utah Division of State History notes that it more than tripled in population between 1990 and 2000. In late 1993 the Deseret News counted about 7,500 residents and 1,600 to 1,700 homes, with large subdivisions such as South Mountain in the works.
Census figures today show the result. Of about 17,448 Draper homes, 5,087 were built in the 1990s and 6,042 in the 2000s, and the median home dates from 2003. Fewer than 1 in 10 went up before 1990.
In houses this age the board itself is usually sound. What wears are the seams, corners and ceilings: tape that cracks over long spans, corner bead dented by furniture, and holes left by TV mounts, old shelving and moved outlets. Tall entries and vaulted ceilings need scaffolding, so a repair up high is planned around reaching it safely.
What Draper asks to see before a basement is finished
Draper says all construction work on homes, including basement finishes, remodels and second kitchens, needs a building permit. Applications go through the city's online portal, with drawings in one unlocked PDF so the plans examiners can comment on them.
The city's basement finish checklist, revised in November 2023, has several items that decide where drywall goes. It asks for a cross-section showing the heights of ceilings, fur-downs and soffits, and says surface-mounted lights and other projections can't reach into the required 7-foot minimum height. It also wants every room labeled, existing areas marked apart from new ones, egress from bedrooms shown, smoke and carbon monoxide detectors located, and insulation in any wall between heated and unheated space.
Two more items move walls around. An electrical panel can't end up inside a closet or a bathroom, and a new bathroom needs an exhaust fan vented outside or a window with at least 1.5 square feet that opens. If the work changes the structure, the city wants engineering calculations with framing plans and details.
Soffits and stair closets in a Draper basement
Ducts and drain lines that hang below a basement ceiling are usually boxed in with framed soffits, then covered in drywall. In Draper, check those soffits against the 7-foot line before framing, since the checklist's cross-section will show them to the plans examiner.
Storage under the basement stairs has its own rule. Utah builds to the 2021 International Residential Code, which says an enclosed space under stairs with a door or access panel must have its walls, the underside of the stairs and any soffits covered on the enclosed side with 1/2-inch gypsum board.
Soffits are boarded along with the ceiling, before the walls, and their outside corners get metal or paper-faced bead so the edges stay straight and take a hit without chipping.
Basement apartments under Draper's ADU rules
Draper allows an internal accessory dwelling unit, such as a basement apartment, inside the footprint of a home. The city's rules say the main home must be owner-occupied and the property needs at least one extra parking space, not in tandem behind another. If the garage is enclosed to make the unit, another garage has to be provided.
Sort out those approvals before the walls close. A basement kitchen, bathroom or bedroom brings in the egress, ventilation and detector items from the checklist, and wiring and ducts are much easier to run while the framing is still open.
Hillside ground, faults and cracks that come back in Draper
Draper's foothills carry geologic hazards, and the city's rules reflect them. Its building division won't accept plans for a new home until a geotechnical engineering report for that parcel has been reviewed and accepted. The city's geotechnical standards, dated December 2025, judge fault activity against the earthquake record of the Salt Lake City and Provo segments of the Wasatch fault, and set minimum standards for fault, liquefaction, debris-flow and rockfall studies.
On April 22, 2023, a landslide on Springtime Road collapsed two Draper homes that had been evacuated the October before, and two more homes were ordered out. The Utah Geological Survey describes the site as residential building pads engineered to fill a ravine.
Most cracks in Draper walls have ordinary causes: framing dries, houses settle, seams open. The warning signs look different. A crack that returns soon after patching, cracks that keep getting wider, doors and windows that start to bind, or gaps opening between walls and floors call for a structural or geotechnical engineer before any patching, because a patch over moving framing will crack again.
Asbestos rules and Draper's newer houses
Because so much of Draper went up after 1991, most popcorn ceiling jobs here skip a step that older cities can't. Utah's air quality rules no longer call for an asbestos inspection before renovation in houses and small buildings, up to four units, built since January 1, 1992.
A Draper house built in 1990 or 1991, or one of the roughly 1,500 homes built before 1990, still needs that inspection before a contractor scrapes a ceiling or opens walls.
Drywall questions from Draper homeowners
Do I need a permit to finish my basement in Draper?
Yes. Draper requires a building permit for basement finishes, remodels and added kitchens. You apply through the city's online portal with the drawings in one unlocked PDF, and the work is inspected as it goes.
How low can a basement soffit be in Draper?
The city's checklist says surface-mounted lights and other projections can't encroach into the required 7-foot minimum height, and it asks for a cross-section showing ceiling, fur-down and soffit heights. Measure from the finished floor to the bottom of the finished drywall before framing.
Does a Draper home built in 2002 need an asbestos test before popcorn removal?
The state doesn't require one. Houses with four or fewer units built from January 1, 1992 onward are exempt from Utah's pre-renovation asbestos inspection. Homes built before that date still need it when a contractor does the work.
A crack in my Draper home keeps coming back. What should I do?
Find the cause before patching it again. A crack that returns quickly, widens, or comes with sticking doors can mean the framing or the ground is moving. A structural or geotechnical engineer can tell which, and the drywall repair comes after that.
How do I get a free drywall estimate in Draper?
Phone (801) 735-8491. Or open the estimate form, add your contact details and the service, and say a little about the job, such as room sizes and whether the basement is already framed. There is no charge and no obligation.
Sources
- American Community Survey 2020 to 2024 5-year, tables B25034 and B25035, year structure built, Draper city (US Census Bureau, via Census Reporter)
- Draper (Utah Division of State History, History to Go)
- Developers zeroing in on Draper, December 29, 1993 (Deseret News)
- Building permits, online portal and geotechnical report requirement (Draper City)
- Basement finish / remodel permit submission requirements, revised November 6, 2023 (Draper City)
- Accessory dwelling units permits (Draper City)
- Geotechnical engineering standards with appendices, December 2025 (Draper City)
- Draper Springtime Road landslide, Salt Lake County (Utah Geological Survey)
- Utah geologist gives exclusive insight into Draper collapses, April 2023 (KSL)
- Utah Code 15A-2-103, specific editions adopted: the 2021 International Residential Code (Utah Legislature)
- Utah Residential Code 2021, chapter 3, section R302.7 under-stair protection (UpCodes)
- Asbestos program and the post-1991 residential exemption (Utah Department of Environmental Quality, Division of Air Quality)